Sinopsis
This series from longtime columnist and chronic forward-thinker Howard McKew covers a lot of ground -- from retrocommissioning to systems training, on toward checklists for drawings and tips for meeting minutes. Click through for the full list and jump in.
Episodios
-
12. A Sales Engineer's Cookbook
30/08/2011 Duración: 10minTransferring the right knowledge at the right time, to the right person, is critical for projects present and future. Listen and take a step toward creating your own recipe for success.
-
11. The Trouble With TAB
30/08/2011 Duración: 07minThe air and water balancing standards and benefits are beneficial, so why does reality so often fall short? Let's look at how to tweak the process to make the most of TAB.
-
10. The Problem With Systems Training
30/08/2011 Duración: 05minWhy does this training systematically fall through the cracks, and how can we tweak the process to fix it?
-
09. Qualifying RFPs
30/08/2011 Duración: 06minBe careful when preparing RFPs and know your closing ratio. Download this podcast now for plenty more about how to best handle RFPs.
-
08. Meeting minutes
30/08/2011 Duración: 06minA meeting without someone taking minutes is a meeting wasted. Tricks of the trade for making the most of the "time" part of the "time = money" equation.
-
07. The Cost of Enhanced Cx
30/08/2011 Duración: 06minPrerequisite commissioning and enhanced commissioning credit for LEED™ certification doesn't cost anything – it's part of the design review.
-
06. Work Orders
30/08/2011 Duración: 05minA continuation of the January 2008 Tomorrow's Engineer column focusing on preventive maintenance work orders, this podcast details how a picture is worth a thousand words, and much more.
-
05. Time Management
30/08/2011 Duración: 03minDon't even think about returning to the office without meeting minutes being recorded – doing so often results in key items being neglected, which in turn often results in big (read costly) problems.
-
04. Checklists
30/08/2011 Duración: 03minWho really needs checklists to ensure quality control for drawings? Wouldn't you rather just keep it all in your head? After all, what's the worst that could happen?
-
03. Closeout At The Start
30/08/2011 Duración: 05minWhy ask for the O&M documentation at the beginning? And which details to require for effective preventive maintenance and a clean closeout? We've got answers.
-
02. The Steps Of Retrocommissioning
30/08/2011 Duración: 07minAn overview, from putting together the team to benchmarking your data.
-
01. The Four Drivers Toward Retrocommissioning
30/08/2011 Duración: 04minSpace comfort, homeland security, energy conservation ... and just what is "The Gap"?