Ashley Elsdon: Recordings

The Level Crossing in Reigate

Informações:

Sinopsis

This is a sound I've been meaning to record for a long time. This recording is about 3.45 long. The level crossing closes at around 1:10 and then later, after the 2 minute mark you can hear the train leave. It's a GWR diesel.