Franklin (MA) Matters
FM #1557 - DPW - Water & Sewer Project Updates - 10/21/25
- Autor: Podcast
- Narrador: Podcast
- Editor: Podcast
- Duración: 1:02:02
- Mas informaciones
Informações:
Sinopsis
This session of the radio show shares my conversation with Doug Martin, Franklin’s Water and Sewer Superintendent and Jake Standly, the Assistant Water/Sewer Superintendent . We had our conversation in the Franklin Public Radio studios on Hutchinson St on Tuesday, October 21, 2025. Our conversation covered updates on Water & Sewer projects previously discussed in each their own three-part series. The show notes include links to the Franklin water & sewer division page Let’s listen to this part of my conversation with Doug and Jake and learn about the updates to Franklin’s sewer and water projects. ---------------------Water Sewer Division - https://www.franklinma.gov/water-sewer-divisionThe main page contains links to the both of the 3-part series on water and sewer.Beaver Street interceptor project -> https://www.franklinma.gov/557/Beaver-Street-Interceptor-BSI-ProjectCharles River Pollution Control (sewerage processor) https://www.franklinma.gov/charles-river-pollution-control